Question: Chapter 4 An inflow hydrograph is given for a reservoir that has a weir spillway outflow structure. The flow through tbe spillway is governed by

Chapter 4
An inflow hydrograph is given for a reservoir that has a weir spillway outflow structure. The flow through tbe spillway is governed by the equation Q=3.75Ly^3/2(cfs) where L is the length of the weir and y is the height of the water above the spillway crest. The storage in the reservoir is governed by
S=300y(ac-ft)
Using t=12hr,L=15ft, and S0=Q0=0, route the inflow hydrograph through the reservoir using the storage indication method.
\table[[\table[[Time],[(hr)]],\table[[Inflow],[(cfs)]]],[12,40],[24,35],[36,37],[48,125],[60,340],[72,575],[84,722],[96,740],[108,673],[120,456],[132,250],[144,140],[156,10]]
Chapter 4 An inflow hydrograph is given for a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!