Question: Chapter 8: Material Flow Analysis and Facility Layout Prior to attempting these problems, you should try to solve #5, 9, 11 and 13 in the

Chapter 8: Material Flow Analysis and Facility

Chapter 8: Material Flow Analysis and Facility Layout Prior to attempting these problems, you should try to solve #5, 9, 11 and 13 in the text. The answers for these problems are in the back of the book. M5_P1. The process design team at a Sylva Manufacturing has broken an assembly process into 8 basic steps, each with a required time and predecessor, as shown in the table. There are 7.5 productive hours available in a day, and the Sylva wishes to produce 400 units. Immediate Predecessors Task A B C Time (sec) 45 50 20 55 15 65 25 35 A A A D E D F D G . E B, C, F, G a) What should their takt time be? b) What is the theoretical minimum number of stations? c) Operations managers and process engineers design a line that contains 6 stations. What is the efficiency? d) Operations managers and process engineers design a line that contains 6 stations. What is the percentage of idle time? e) The managers decide to balance the line by assigning tasks to workstations to fill up as much task time as possible. Break ties by assigning the longest task first. What task(s) should be assigned at the third workstation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!