Question: Check for missclosure / closure error and qualify the work. The elevation of point A is 1 5 2 . 6 5 m . The

Check for missclosure/closure error and qualify the work. The elevation of point A is 152.65m. The leveling route has a perimeter of 4000m and the work is a 3rd degree order.
\table[[Point,BS,FS],[BM A,3.21,],[B,1.90,2.98],[C,2.00,3.32],[D,3.40,2.87],[BM A,,1.32]]