Question: Check Score Hide Answer Show Solution Try Another Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has

Check Score Hide Answer Show Solution Try Another
Check Score Hide Answer Show Solution Try Another Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders. Embassy produces the engines for both models at its Des Moines, Iowa plant. Each EZ-Rider engine requires 6 hours of manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2,100 hours of engine manufacturing time available for the next production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-Sport frame is more complex and the supplier can only provide up to 260 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Lady-Sport model. A maximum of 850 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2,400 for each EZ-Rider produced and $1,800 for each Lady-Sport produced. (a) Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. (Let E represent the EZ-Rider model and let represent the Lady-Sport model.) 2,400E+ 1) s.t. 1)E+ ( Des 2,100 Engine manufacturing time LS Lady-Sport maximum 2E + 2.5Ls Assembly and testing time E,L20 Max (b) Solve the problem graphically. What is the optimal solution? (EL) - I (c) Which constraints are binding? (Select all that apply.) Engine manufacturing time Lady-Sport maximum Assembly and testing time Need Help? Read it

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!