Question: choose the best answer below: During requirements flow-down System requirements are implemented by the next system element on the Bill of Materials System requirements are
choose the best answer below: During requirements flow-down System requirements are implemented by the next system element on the Bill of Materials System requirements are strongly aligned with management planning and decision making System requirements identify the major stages that a specific SoI goes through, from its inception to its retirement System requirements are allocated to the system elements at the next level of the system hierarchy System requirements are handed down to the junior engineer at the next level of the department hierarchy