Question: Class Problem [ 4 0 pts ] | teams of up to 4 ] A manufacturing line consists of 4 separate processes. The arrival mean

Class Problem [40pts]|teams of up to 4]
A manufacturing line consists of 4 separate processes. The arrival mean is based on Takt time. Assume no scrap, blocking, transport times, setup times. All times in minutes.
10pts Which operation is the main bottleneck process for the line? Is variability increased or decreased downstream from it? Explain the rationale for your answer.
[15pts] Calculate CVe,e, and CVd for OP1. You may use the spreadsheet to confirm, but must show work.
[15pts] It is desired to reduce flowtime and WIP for the system significantly. There are four alternatives, each of approximately equal cost:
a. OP4 and OP2 positions can be swapped on the line
b. The processing time standard deviation of OP2 can be reduced by 12.
c. OP2 processing time can be reduced to 1.65
d. The MTTF of OP2 can be extended to 200 hours.
Which option should be selected? Justify your answer. Use the spreadsheet.
Love Purple
Dequitment of Merturieat and Industrial Inginecting
Lean Mernufacturing Systeins (ID1530)
LOVE PURPLE
 Class Problem [40pts]|teams of up to 4] A manufacturing line consists

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!