Question: | CMGT 2 1 0 3 Week 1 5 Assignment - Mini - Estimate I have been through all the chapter in the book that
CMGT
Week Assignment MiniEstimate
I have been through all the chapter in the book that I wanted to cover online. For the last week of the class, the assignment will be to complete a small estimate. Normally I would give you a drawing and you would determine the quantities, then determine the material and labor costs. For this assignment, I will give you some numbers the takeoff and you will need to determine the material and labor costs. You will need the concrete pricing sheet and productivity sheet from the earlier assignments.
Assignment Problem a one story house with walls
Concrete
The slab is
The concrete is psi, there are no additives but do not forget Environmental fee and taxes.
Lumber Roof
The Barge Rafters are long
The Rafters are spaced on center
The Ridge Board is long
Lumber Walls
There are studs needed
The total length of the walls is interior & exterior
Prices
The concrete crew makes $ hour
The carpenter crew makes $ hour
rafters$
studs$
double top plate$
treated bottom plate$ ea
OSB Roof & Wall Sheathing $ ea
Solve for the material and labor costs for the:
Concrete
Rafters
Roof Sheathing
Wall studs
Double top plate
Treated bottom plate
Exterior wall sheathing
Remember to use high productivity for this assignment.
Put your answers in the Excel spreadsheet and upload it into your canvas page.
Do not forget your name on the spreadsheet or I will count it as incomplete and you will lose points.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock