Question: | CMGT 2 1 0 3 Week 1 5 Assignment - Mini - Estimate I have been through all the chapter in the book that

| CMGT 2103
Week 15 Assignment - Mini-Estimate
I have been through all the chapter in the book that I wanted to cover online. For the last week of the class, the assignment will be to complete a small estimate. Normally I would give you a drawing and you would determine the quantities, then determine the material and labor costs. For this assignment, I will give you some numbers (the takeoff) and you will need to determine the material and labor costs. You will need the concrete pricing sheet and productivity sheet from the earlier assignments.
Assignment Problem - a 58'24'- one story house with 8' walls
Concrete
The slab is 58'24'4''
The concrete is 2,500psi, there are no additives but do not forget Environmental fee and taxes.
Lumber - Roof
The Barge Rafters are 26-13.75 long
The Rafters are spaced 24'' on center
The Ridge Board is 58' long
Lumber - Walls
There are 488-2''4''8' studs needed
The total length of the walls is 587'(interior & exterior)
Prices
The concrete crew makes $90? hour
The carpenter crew makes $70? hour
2''6''18'(rafters)=$10.28ea
2''4''8'(studs)=$2.75ea
2''4''12'(double top plate)=$4.76ea
2''4''12'(treated bottom plate)=$5.98? ea
OSB Roof & Wall Sheathing =$14.57? ea
Solve for the material and labor costs for the:
Concrete
Rafters
Roof Sheathing
Wall studs
Double top plate
Treated bottom plate
Exterior wall sheathing
Remember to use high productivity for this assignment.
Put your answers in the Excel spreadsheet and upload it into your canvas page.
Do not forget your name on the spreadsheet or I will count it as incomplete and you will lose points.
| CMGT 2 1 0 3 Week 1 5 Assignment - Mini -

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!