Question: Code Activity Name 1 . Site Preparation 1 . 1 Establish site boundaries 1 . 2 Complete dilapidation report 1 . 3 Erect site temporary

Code
Activity Name
1.
Site Preparation
1.1
Establish site boundaries
1.2
Complete dilapidation report
1.3
Erect site temporary fencing
1.4
Establish environmental protection
1.5
Establish temporary site accommodation
1.6
Markout / cap existing services
1.7
Bulk Excavation of top soil/unwanted soil
Detailed excavation
1.8
Survey / peg out new works
1.9
Establish temporary services
1.10
Erect scaffold stair tower
1.11
Erect roof safety rail
2.
Foundation
2.1
Form Footings
2.2
Steel Reinforcement for footings
2.3
Strip Footing Formwork
Pour Ground Slab Footings
Tie reo for footings and hardstands
2.4
Concrete pour Slab footings
2.5
Concrete curing
2.6
Mark and excavate for drainage.
2.7
Aggregate spreading and compacting
2.8
Install electrical conduits
Form ground slab Unit 2
2.9
Mesh reinforcement in slab Unit 2
2.10
Pour concrete slab Unit 2
2.11
Allow adequate curing time
2.12
Quality control and inspection
3.
Structure
3.1
Erect structural steel
3.2
Erect concrete wall panels INCL temporary propping
3.3
FRP suspended concrete floors INCL concrete columns
3.4
FRP off-form concrete columns
3.5
Installation of fire rated intertenancy wall INCL set & sand
3.6
FRP suspended concrete stairs
4.
Services
4.1
Install in-ground services
4.2
Hydraulic rough-in
4.3
Electrical rough-in
4.4
Mechanical rough-in
4.5
Hydraulic fit-off
4.6
Electrical fit-off
4.7
Mechanical fit-off
4.8
Drainage
4.9
Testing and commissioning
4.10
Certification
5.
Internal Finishes
5.1
Internal wall and ceiling framing
5.2
Install internal wall linings INCL set & sand
5.3
Install internal ceiling grids
5.4
Initial paint & seal amenities
5.5
Apply screeds INCL setting angles amenities
Lay & cure floor membranes amenities
5.6
Install floor tiles amenities
5.7
Install wall tiles amenities
5.8
Install WC partitions
5.9
Installation of lunchroom joinery units INCL stone benchtops
Supply and installation of fire rated intertenancy wall
6.
External Finishes
6.1
Upper metal roof sheeting INCL safety wire, insulation, roof lights, flashings, cappings
6.2
Installation of gutters
6.3
External fibre cement and aluminium wall framing / cladding subframing
6.4
Install external aluminium windows and glazing units
6.5
External fibre cement and aluminium cladding INCL spandrel panels
6.6
Installation of aluminium extruded sun blades
6.7
Installation of gutters PVC downpipes
6.8
Hang external egress doors & fit hardware
6.9
Install metal roller shutters INCL commissioning
6.10
Installation of external customer signage
7.
External Works
7.1
Install palisade fencing
7.2
Soft landscaping (mulching, grass, planting)
7.3
Construct new concrete kerbs
7.4
Install external line marking INCL wheel stops
7.5
Security System installation
7.6
Fire Safety
7.7
Outdoor lighting
7.8
Outdoor Irrigation
7.9
Paving worksWork out the resource requirements and durations for a representative sample of activities (at least
30 activities should be included) taking into account the quantities, crew sizes, labour and plant
productivity rates and efficient work cycles. (Include copies of the reference labour/plant productivity rates
used, e.g., Rawlinsons, Cordels, etc). The quantities are derived from the measurements you make for
each activity. Assumptions can be made when necessary. Cost information is not required.
Task 3: Resource Requirements and Durations
Tips:
?** Code of activity should be consistently used in all tasks of this assessment
"*Activity name
?****** Type of resource used in this activity
Duration of this activity is dominated by the productivity of the track excavator
Questiwdwe
Code Activity Name 1 . Site Preparation 1 . 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!