Question: Code Activity Name 1 . Site Preparation 1 . 1 Establish site boundaries 1 . 2 Complete dilapidation report 1 . 3 Erect site temporary
Code
Activity Name
Site Preparation
Establish site boundaries
Complete dilapidation report
Erect site temporary fencing
Establish environmental protection
Establish temporary site accommodation
Markout cap existing services
Bulk Excavation of top soilunwanted soil
Detailed excavation
Survey peg out new works
Establish temporary services
Erect scaffold stair tower
Erect roof safety rail
Foundation
Form Footings
Steel Reinforcement for footings
Strip Footing Formwork
Pour Ground Slab Footings
Tie reo for footings and hardstands
Concrete pour Slab footings
Concrete curing
Mark and excavate for drainage.
Aggregate spreading and compacting
Install electrical conduits
Form ground slab Unit
Mesh reinforcement in slab Unit
Pour concrete slab Unit
Allow adequate curing time
Quality control and inspection
Structure
Erect structural steel
Erect concrete wall panels INCL temporary propping
FRP suspended concrete floors INCL concrete columns
FRP offform concrete columns
Installation of fire rated intertenancy wall INCL set & sand
FRP suspended concrete stairs
Services
Install inground services
Hydraulic roughin
Electrical roughin
Mechanical roughin
Hydraulic fitoff
Electrical fitoff
Mechanical fitoff
Drainage
Testing and commissioning
Certification
Internal Finishes
Internal wall and ceiling framing
Install internal wall linings INCL set & sand
Install internal ceiling grids
Initial paint & seal amenities
Apply screeds INCL setting angles amenities
Lay & cure floor membranes amenities
Install floor tiles amenities
Install wall tiles amenities
Install WC partitions
Installation of lunchroom joinery units INCL stone benchtops
Supply and installation of fire rated intertenancy wall
External Finishes
Upper metal roof sheeting INCL safety wire, insulation, roof lights, flashings, cappings
Installation of gutters
External fibre cement and aluminium wall framing cladding subframing
Install external aluminium windows and glazing units
External fibre cement and aluminium cladding INCL spandrel panels
Installation of aluminium extruded sun blades
Installation of gutters PVC downpipes
Hang external egress doors & fit hardware
Install metal roller shutters INCL commissioning
Installation of external customer signage
External Works
Install palisade fencing
Soft landscaping mulching grass, planting
Construct new concrete kerbs
Install external line marking INCL wheel stops
Security System installation
Fire Safety
Outdoor lighting
Outdoor Irrigation
Paving worksWork out the resource requirements and durations for a representative sample of activities at least
activities should be included taking into account the quantities, crew sizes, labour and plant
productivity rates and efficient work cycles. Include copies of the reference labourplant productivity rates
used, eg Rawlinsons, Cordels, etc The quantities are derived from the measurements you make for
each activity. Assumptions can be made when necessary. Cost information is not required.
Task : Resource Requirements and Durations
Tips:
Code of activity should be consistently used in all tasks of this assessment
Activity name
Type of resource used in this activity
Duration of this activity is dominated by the productivity of the track excavator
Questiwdwe
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock