Compare the two projects using expert information. Analyze from the point of view of risk
Project A and development variants Annual cash flow, Euro Project A Development variants Pessimistic Normal (base) Optimistic Project B 40000 60000 70000 40000 60000 800001 Forecasted probability of cash flow projects A and B Development variants Project A Project B Probability Pessimistic Normal (base) Optimistic Annual cash flows, Eur Probability 0.3 40000 0.5 60000 0.2 70000 Annual cash flows, Eur 0.25 40000 0.5 60000 0.25 80000