Question: Compare the two projects with unequal lives using both the replacement chain method to calculate Project B's NPV, WACC = 8.4% A. 292.60 B. 309.80

 Compare the two projects with unequal lives using both the replacement

Compare the two projects with unequal lives using both the replacement chain method to calculate Project B's NPV, WACC = 8.4% A. 292.60 B. 309.80 C. 64.064 D. 67.810