Question: Consider a deep pit solid waste disposal facility constructed in 1 8 m thick horizontal saturated clay layer as shown in Fig . 2 .

Consider a deep pit solid waste disposal facility constructed in 18m thick horizontal saturated clay layer as shown in Fig.2. Underneath the clay layer, there is a sand aquifer with constant thickness (10m). In the waste leachate, two chemicals, Lead (Pb) and Chloride (Cl) are dissolved in relatively high concentration. Two monitoring wells are installed at the upstream side (Well_1) and downstream side (Well_2). Using the hydrogeological conditions and the additions given below, answer the following questions. (40)
-Datum line to define the elevation head: Ground surface z=0m
Leachate level in the pit: Ground surface
-Hydraulic conductivity of clay: K=10-9ms,
-Porosity of clay: n=0.5; density of soil grain: s=2.6gcm3,
-Effective diffusion coefficient of clay: Dm=210-9m2s,
water depths of Well_1 and Well_2: 6m and 10m,
-In the sand layer horizontal flow can be approximated from Well_1 to Well 2.
One dimensional vertical flow can be assumed in the 3m thick clay beneath the pit.
(1) How much are the void ratio (e) and moisture content (w) of the clay?
(2) How much is the transmissivity of sand layer?
(3) How much are the elevation head (hc) and pressure head (hp) at points A and B respectively?
(4) How much are the hydraulic gradient and interstitial velocity in the sand layer?
(5) How much is the interstitial velocity of the downward flow in the clay under the pit center?
(6) Calculate the time (years) for a pollutant to reach the bottom of clay liner in the case with no dispersion condition, assuming zero concentration as the initial condition in the clay.
(7) Explain why the mechanical dispersion can be negligible in the process of contaminant transport in the clay.
(8) By monitoring at well 2, which chemical will be first detected, Chloride (Cl or Lead (Pb)? Also explain the reason of the answer.
(9) Finding the risk of ground water contamination in this site, propose the measures against the risk
Consider a deep pit solid waste disposal facility

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!