Question: Consider a four - station line with a throughput target of three jobs per hour. Suppose the SCV of arrivals to the line is equal

Consider a four-station line with a throughput target of three jobs per hour. Suppose the SCV of arrivals to the line is equal to 1.5. Thus, TH =3 jobs per hour and for the first station. Set the target cycle time for the line at CT =18. Assume that only one type of machine is available at each station. (40 points) StationNumber of MachinesCost (if needed)141.51.5100220.78160331.1290451.60.1110 a) Calculate the Cycle Time (CT) for the given planb) Is the cycle time greater than 18? If so, add machines up until you reach CT of 18 or less.