Question: Consider a problem with an objective to Min. Total Cost = 0.4 Ing A + 0.2 Ing B + 0.6 Ing C + 0.3 Ing
Consider a problem with an objective to Min. Total Cost = 0.4 Ing A + 0.2 Ing B + 0.6 Ing C + 0.3 Ing D The Excel formulation is given. Fill the missing values in the sensitivity report