Question: Consider a process that consists of three steps 1 , 2 and 3 . Steps 1 and 2 are each equipped by a single machine.

Consider a process that consists of three steps 1,2 and 3. Steps 1 and 2 are each equipped by a single machine. Step 3 is performed by a single worker. Each of the process steps works on one unit of work at a time, but must complete a set up between production batches. The required processing times and set-up times at each of the steps are listed below. There is unlimited space for buffer inventory between these steps. The system has an unlimited supply of work available to be performed (i.e., demand exceeds capacity).
Process step Set up time Activity time
150 min 2 min/unit
2120 min 1 min/unit
305 min/
What batch size minimizes WIP without decreasing capacity? Assume all three steps use the same batch size, and that the transfer batch size between steps 1 and 2, and between steps 2 and 3 equals the production batch size (i.e., the units in a production batch must be moved together between steps.).
What batch size minimizes WIP without decreasing capacity? Assume all three steps use the same batch size, and that the transfer batch size between steps 1 and 2, and between steps 2 and 3 equals the production batch size (i.e., the units in a production batch must be moved together between steps.).
10 units
17 units
30 units
100 units
none of the above
Assume that the process starts empty, that set-ups at steps B and C can not begin until work arrives, that the production batch is 10 units at each step, and that the transfer batch between steps 1 and 2, and between steps 2 and 3 is also 10 units (i.e., the units in a production batch must be moved together between steps.) How long does it take to complete a batch of 10 units?
Assume that the process starts empty, that set-ups at steps B and C can not begin until work arrives, that the production batch is 10 units at each step, and that the transfer batch between steps 1 and 2, and between steps 2 and 3 is also 10 units (i.e., the units in a production batch must be moved together between steps.) How long does it take to complete a batch of 10 units?
250 minutes
278 minutes
320 minutes
375 minutes
420 minutes
Assume that the process starts empty, that set-ups at steps B and C can not begin until work arrives, that the production batch is 10 units at each step, and the transfer batch between steps 1 and 2, and between steps 2 and 3 is 1 unit (i.e., the unit completed at one step may be passed immediately to the next step). How long does it take to complete a batch of 10 units?
Assume that the process starts empty, that set-ups at steps B and C can not begin until work arrives, that the production batch is 10 units at each step, and the transfer batch between steps 1 and 2, and between steps 2 and 3 is 1 unit (i.e., the unit completed at one step may be passed immediately to the next step). How long does it take to complete a batch of 10 units?
125 minutes
134 minutes
187 minutes
190 minutes
None of the above

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!