Question: Consider a system with a single resource and a single processing step. Each arriving job consists of multiple items, and each job can be broken

Consider a system with a single resource and a single processing step. Each arriving job consists of multiple items, and each job can be broken down into multiple batches if so desired. Each batch has a SHORT (but positive) setup time while each item has a LONG pure processing time. If we want to minimize the throughput time of the FIRST completed item of a job, then:

A - We should go for a single (large) batch

B - The batch size doesn't matter

C - We should go for several (medium sized) batches

D - We should go for a batch size of 1