Question: Consider a system with eight servers. The servers may fail individually, they fail at rate 0.004 and are repaired at rate 1 (repairs can be
Consider a system with eight servers. The servers may fail individually, they fail at rate 0.004 and are repaired at rate 1 (repairs can be made in parallel). The servers also share a common power supply, which fails at rate 2 106 and is repaired at rate 0.02. When the power supply fails, all of the servers stop working. Calculate the expected time until less than six servers are working