Question: Consider again that a bottle-filling process has a low specification limit of 1.8 liter and upper specification limit of 2.2 liter. The standard deviation is

Consider again that a bottle-filling process has a low specification limit of 1.8 liter and upper specification limit of 2.2 liter. The standard deviation is 0.15 liter and the mean is 2 liter. What is the probability that a bottle will either be too much or too little? (You can use Excel function or Table 9.1)