Question: Consider the below deterministic unbalanced line. Design an equivalent deterministic balanced line that has the same bottleneck rate and the same number of workstations. The
Consider the below deterministic unbalanced line. Design an equivalent deterministic balanced line that has the same bottleneck rate and the same number of workstations. The process time (minutes/part) of each machine is represented by