Question: Consider the distribution line system shown in Figure 1 . The protection scheme used for protecting this system uses an SEL - 7 5 1

Consider the distribution line system shown in Figure 1. The protection scheme used for protecting this system uses an SEL-751A Feeder Relay with the setting described as follows:
Programmed with C1 Characteristic Curve. Time dial (TD) of 1. Maximum (all) Phase TOC of 1 Amp
Figure 1: Distribution line supply system with SEL-751A Feeder Relay 751A11D1D0X76811610, and 2011
1.1 Calculate, the flow of current in the feeder when the load is operating at its maximum capacity.
1.2 Determine in seconds how long the IED will take to send the trip signal to the circuit breaker when the current flow in the system is double the maximum rated current of the load.
Consider the distribution line system shown in

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!