Question: Consider the distribution line system shown in Figure 1 . The protection scheme used for protecting this system uses an SEL - 7 5 1
Consider the distribution line system shown in Figure The protection scheme used for protecting this system uses an SELA Feeder Relay with the setting described as follows:
Programmed with C Characteristic Curve. Time dial TD of Maximum all Phase TOC of Amp
Figure : Distribution line supply system with SELA Feeder Relay ADDX and
Calculate, the flow of current in the feeder when the load is operating at its maximum capacity.
Determine in seconds how long the IED will take to send the trip signal to the circuit breaker when the current flow in the system is double the maximum rated current of the load.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
