Question: Consider the following batch flow process consisting of three process steps performed by three machines: Work is processed in batches at each step. Before a
Consider the following batch flow process consisting of three process steps performed by three machines:
Work is processed in batches at each step. Before a batch is processed at step the machine has to be set up During a setup, the
machine is unable to process any product.
a Assume that the batch size is parts. What is the capacity of the process?
The process capacity of the entire process
is
b For a batch size of parts, which step is the bottleneck for the process?
c What batch size would you choose?
d Suppose the batch size is parts. What would be the average inventory after step Assume step can use idle time so its
production rate does not exceed the capacity of the process.
Help with part c and d
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
