Consider the following long sheet-piled trench built within a uniform sandy ground of 18 m in depth,
Fantastic news! We've Found the answer you've been seeking!
Question:
Consider the following long sheet-piled trench built within a uniform sandy ground of 18 m in depth, overlying an impermeable clay layer.
2.1 Sketch a flownet. Ensure your sketch is made to scale. Show the values of NF and NH for the flownet in your sketch.
2.2 Based on the flownet sketched, determine and sketch the water pressure acting on the sheet pile wall.