Question: Consider the following system with 5 processes PO through P4 and four resorce type AB,C,D. At time To the following snapshot of the system
Consider the following system with 5 processes PO through P4 and four resorce type AB,C,D. At time To the following snapshot of the system was take Process Allocation PO P1 P2 P3 P4 A 3 2 2 0 3 B 0 2 3 1 2 C 1 0 1 2 5 D 1 0 0 2 0 Max A B 8 0 2 2 5 1 Available A B 3 0 2 C D 2 1 1 NO 3 2 2 7 5 3 6 1 2 C D 1 1 Use the Banker's algorithm to determine whether the system in a safe state. Show a safe sequence, if one exists. Show all working. (10 Marks)
Step by Step Solution
3.42 Rating (155 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
