Question: Construction Quality Control Documentation Module 4 Assignment There is a total of 30 points for this assignment 1. Identify the appropriate phase (preparatory, initial, or

Construction Quality Control Documentation Module 4 Assignment There is a total of 30 points for this assignment 1. Identify the appropriate phase (preparatory, initial, or follow-up) of construction for the ten activities listed below by placing a Prep, Initial, and/or Follow-up next to it. Three-point total ACTIVITIES P, I, F CHECKING TEMPERATURE OF IN-PLACE CONCRETE OBSERVING ERECTION OF A SAMPLE PANEL OF CMU VERIFYING ALL SUBMITTALS HAVE BEEN SUBMITTED AND APPROVED DEVELOPMENT OF AN EXCAVATION PLAN START UP OF THE PAINTING CONTRACTOR GRADATION CHECK OF STONE AT THE QUARRY CALIBRATION CHECK OF DENSITY METER BEFORE BRINGING TO SITE DAILY CHECK OF WORKERS' HARD HATS REVIEW OF CONTROLS PERTAINING TO A FEATURE OF WORK REPLACEMENT OF A LIFT OF CONCRETE 2. Given the 4 activity boxes below, provide the description of each activity in sequence of the Design activities used for each discipline on an Engineer and Construct (Design Build) logic. Exclude the Start and Finish activities. 4 Point total 05 10 15 20

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!