Question: Costs associated with two alternatives, code - named Q and R , being considered by Albiston Corporation are listed below:Alternative l$ 8 6 , 0
Costs associated with two alternatives, codenamed Q and R being considered by Albiston Corporation are listed below:Alternative l$ $ $ $Alternative R$ $ $ $ ::Supplies costsPower costsInspection costsAssembly costsRequired:a Which costs are relevant and which are not relevant in the choice between these two alternatives?b What is the differential cost between the two alternatives?a Supplies costsa Power costsa Inspection costsa Assembly costsb Differential cost