Question: Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: Standard Hours or Quantity Standard
Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:
| Standard Hours or Quantity | Standard Price or Rate | |
| Direct materials | 3.0 pounds | 0.75 per pound |
| Direct labour | 0.4 hours | 12.00 per hour |
| Variable manufacturing overhead | 0.4 hours | 9.00 per hour |
During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of direct labour hours. The following events occurred during March: 8,600 pounds of sand were purchased at a cost of 7,310. 7,200 pounds of sand were used for core tests. 840 actual direct labour hours were worked at a cost of 8,610. Actual variable manufacturing overhead incurred was 3,200. The labour rate variance for March is:Multiple Choice
-
1,470 unfavourable.
-
1,470 favourable.
-
4,578 unfavourable.
-
4,578 favourable.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
