Question: Crayon - Top Corr X Bb Matching Supply X Thread: Don't have X Bb Matching Supply X Unit 1: Process An X C Operations Manag

Crayon - Top Corr X Bb Matching Supply X Thread:

Crayon - Top Corr X Bb Matching Supply X Thread: Don't have X Bb Matching Supply X Unit 1: Process An X C Operations Manag X C Bb Matching Supp X Course Hero C Get Homework He X + O https://bbnewpaltz.sin.suny.edu/courses/1/summer21_BUS312_01/db/_3112179_1 Q Search NORME 93 (1 of 2) https:/bbrevpaltz.sn.suny.edu/courses/1/sumer 21_BUS312_01/01/_3112179_1 104.3.pot wwww. p. empty system? b. What is the average labor content? c. What is the average lubor utilization? d. What is the cost of direct labor! 04.2** (Assign Tasks to Workers) Consider the following six tasks that must be assigned to four workers on a conveyor-paced assembly line (i.e., a machine-paced line flow). Each worker must perform at least one task. Task 1 Task 2 Task 3 Task 4 Tasks Task 6 Time to Complete Task (seconds) 30 25 35 40 15 30 The current conveyor-paced assembly line configuration assigns the workers in the following way Worker 1: Task 1 Worker 2: Task 2 Worker 3: Tasks 3, 4 Worker 4: Tasks 5,6 1. What is the capacity of the current line? b. Now assume that tasks are allocated to maximize capacity of the line, subject to the conditions that (1) a worker can only perform two adjacent opcrations and (2) all tasks need to be done in their numerical order. What is the capacity of this line now? c. Now assume that lasks are allocated to maximize capacity of the line and that tasks can be performed in any order. What is the maximum capacity that can be uchieved? (Power Toys) Power Toys Inc. produces a small remote-controlled toy truck on a con- veyor belt with nine stations. Each station has, under the current process layout, onc worker assigned to it. Stations and processing times are summarized in the following table: 04.3 (* indicates that the solution is at the end of the book) Crayon - Top Corr X Bb Matching Supply X Thread: Don't have X Bb Matching Supply X Unit 1: Process An X C Operations Manag X C Bb Matching Supp X Course Hero C Get Homework He X + O https://bbnewpaltz.sin.suny.edu/courses/1/summer21_BUS312_01/db/_3112179_1 Q Search NORME 93 (1 of 2) https:/bbrevpaltz.sn.suny.edu/courses/1/sumer 21_BUS312_01/01/_3112179_1 104.3.pot wwww. p. empty system? b. What is the average labor content? c. What is the average lubor utilization? d. What is the cost of direct labor! 04.2** (Assign Tasks to Workers) Consider the following six tasks that must be assigned to four workers on a conveyor-paced assembly line (i.e., a machine-paced line flow). Each worker must perform at least one task. Task 1 Task 2 Task 3 Task 4 Tasks Task 6 Time to Complete Task (seconds) 30 25 35 40 15 30 The current conveyor-paced assembly line configuration assigns the workers in the following way Worker 1: Task 1 Worker 2: Task 2 Worker 3: Tasks 3, 4 Worker 4: Tasks 5,6 1. What is the capacity of the current line? b. Now assume that tasks are allocated to maximize capacity of the line, subject to the conditions that (1) a worker can only perform two adjacent opcrations and (2) all tasks need to be done in their numerical order. What is the capacity of this line now? c. Now assume that lasks are allocated to maximize capacity of the line and that tasks can be performed in any order. What is the maximum capacity that can be uchieved? (Power Toys) Power Toys Inc. produces a small remote-controlled toy truck on a con- veyor belt with nine stations. Each station has, under the current process layout, onc worker assigned to it. Stations and processing times are summarized in the following table: 04.3 (* indicates that the solution is at the end of the book)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!