Question: Crystal Fabrication allocates manufacturing overhead using a single predetermined rate based on a planned use of 1 2 , 0 0 0 direct labour hours
Crystal Fabrication allocates manufacturing overhead using a single predetermined rate based on a planned use of direct labour hours per year. Company leadership recently learned that its costing system may be too simple for its operations, and that job costs may be fairly inaccurate. A consultant was hired to study overhead costs, and the following information reflects the cost pools and activity rates that were determined:
Based on the information presented in the introduction and table above, Crystal Fabrications single predetermined manufacturing overhead cost rate is
a
$direct labour hour
b
$direct labour hour
c
$direct labour hour
d
$direct labour hour begintabularccc
hline Cost Pool & Total Cost & Activity Rate
hline Purchasing & $ & $purchase order
hline begintabularl
Machine
Setups
endtabular & $ & $setup
hline Assembly & $ & $direct labour hour
hline Inspections & $ & $inspection
hline Total & $ &
hline
endtabular
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock