Aproject has three paths. A-B-C has a length of 25 days. A-D-C has a length of 15 days. Finally, A-E-C has a length of 20 days. Which one of the following statements is true?
A.D-C is the critical path.
The expected duration of this project is 25+15+20=60 days.
The expected duration of this project is 25 days.
A.B.C has the most slack.