Question: cycle Time Example Problem An order for Order Quantity of a product is processed on work centers A and B. The setup time on A

cycle Time Example Problem

An order for Order Quantity of a product is processed on work centers A and B. The setup time on A is Work Centre A - Setup Time, and run time is Work Centre A - Run Time Per Piece. The setup time on B is Work Centre B - Setup Time, and the run time is Work Centre B - Run Time Per Piece. Wait time between the two operations is Wait time after Work Center A (Minutes). The move time between A and B is Move Time from A to B. Wait time after operation B is Wait Time after Work Center B (Minutes), and the move time into stores is Move Time from B to Stores. There is no queue at either workstation. Calculate the total manufacturing lead time for the order.Use the data on the spreadsheet to make your calculation. Note: Provide all answers as whole numbers.

Note: All fields above in bold are provided on the Excel spreadsheet.

Cycle Time Example Problem Time (Minutes) Work Centre A - Setup Time 32 Work Centre A - Run Time Per Piece 11 Wait time after Work Center A (Minutes) 182 Move Time from A to B 11 Work Centre B - Setup Time 39 Work Centre B - Run Time Per Piece 5 Wait Time after Work Center B (Minutes) 209 Move Time from B to Stores 19 Order Quantity 116 TOTAL CYCLE TIME (Minutes)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!

Q:

\f