Question: d ) A pipe draining an area ( A ) of 7 5 0 0 m 2 Carpark in new shopping centre has been calculated

d) A pipe draining an area (A) of 7500m2 Carpark in new shopping centre
has been calculated as having a time of concentration (tc) of 10mins.
Using a design storm (P) of 8mm calculate the peak runoff (QP) in 1s in
the pipe assuming that the runoff coefficient (C) is 09
Rational Method: Qp= CiA
Intensity of Rainfall: i=Ptc