Question: D Question 4 1 pts A bread - making factory has the production process shown in the figure below. There are five operations in sequence.

D Question 41 pts A bread-making factory has the production process shown in the figure below. There are five operations in sequence. The product only needs to go through one of the parallel machines in each case where parallel machines exist. What is the bottleneck operation of this process? Proof 60 min./batch Mix Bake Pack 50 min/batch 60 min./batch 40 min./batch Proof Cut 60 min./batch 35 min./batch Mix Bake Pack 50 min/batch Proof 60 min./batch 40 min./batch 60 min./batch O Mix O Proof O Bake O Cut O Pack