Question: D Question 8 1.5 pts LuAnn has three cost pools and associated cost drivers to allocate the costs to the product. The cost pools,
D Question 8 1.5 pts LuAnn has three cost pools and associated cost drivers to allocate the costs to the product. The cost pools, cost driver, estimated overhead (OH), and estimated activity for the cost pool are: Estimated Estimated Predetermined Cost Pool Cost Driver Activity Per Driver OH OH Rate Material Material requisitions 200,000 100,000 Machining Machine hours 360,000 560,000 Inspection Number of inspections 20,000 150,000 Note: If your answer includes a decimal, round to two places behind the decimal point.