Question: d-1. Determine the cost per unit output for part b. (Round your answer to 2 decimal places.) Cost per un $ 0.15 d-2. Determine the

d-1. Determine the cost per unit output for part
d-1. Determine the cost per unit output for part
d-1. Determine the cost per unit output for part
d-1. Determine the cost per unit output for part b. (Round your answer to 2 decimal places.) Cost per un $ 0.15 d-2. Determine the cost per unit output for part c. (Round your answer to 2 decimal places.) Cost per unit e. The product is sold at $4 per unit. Assume that the cost of a drilling machine (fixed cost) is $34,000 and the company produces 7,200 units per week. Assume that four drilling machines are used for production. If the company had an option to buy the same part at $3 per unit, what would be the break-even number of units? (In your calculations, use the two-digit cost per unit from page d-1. Round your answer to the nearest whole number.) Break-even point units Problem 7-15 The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively, Parts A and B are assembled first on assembly line 1, which produces 110 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 40 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 130 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 25 cents per part for each assembly line; the cost of drilling labor is 15 cents per part. For drilling, the cost of electricity is 1 cent per part. The total overhead cost has been calculated as $1,600 per week. The depreciation cost for equipment has been calculated as $30 per week

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!