Question: dam section is shown in Figure below. The hydraulic conductivity of the permeable layer Length of dam = 100 m. Calculate the following in

dam section is shown in Figure below. The hydraulic conductivity of the permeable layer Length of dam = 100 m. Calculate the following in the vertical and horizontal directions are 3 x 102 mm/s and 5 x 102 mm/s respectively and 1- Estimate the seepage under the dam (Q) in m/day using flow net. (25 mark) A and B. 2- How high (above the ground surface) the water will rise if piezometers are placed at points (25 mark) 3- The pressure distribution at points a,b,c and d In kN/m (assuming that kx = K = k) (50 mark) m 1ml a lb 1.0 10 m V 1.0 V 10.4 B
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
