Question: DESCRIPTION UNIT OF COST L.E.M. ITEM NO. S.S. REF QUANTITY Overhead Profit 12% TOTAL UNIT PRICE MEASURE & Subs 1.0 01010S General Information 1.1 22

DESCRIPTION UNIT OF COST L.E.M. ITEM NO. S.S. REF
DESCRIPTION UNIT OF COST L.E.M. ITEM NO. S.S. REF QUANTITY Overhead Profit 12% TOTAL UNIT PRICE MEASURE & Subs 1.0 01010S General Information 1.1 22 Health & Safety Plan L.S. 100% $ 6,000 2.0 02223S EXCAVATING, TRENCHING AND BACKFILLING 2.1 1.1 Excavation & Disposal m3 325 $ 22,750 $ 3,422 $ 3,141 $ 29313 $ 90.19 2.2 1.1 Excavation & Re-use m3 975 S 19,500 3.0 022265 AGGREGATES AND GRANULAR MATERIAL 3.1 1.4.2 Granular Fill (Import) tonne 2600 S 65,000 4.0 02271S RIPRAP 4.1 1.4.2 Rip Rap Type 1 tonne 750 37,500 4.2 1.4.2 Shot Rock tonne 325 17,875 5.0 027215 STORM SEWERS 5.1 1.6.2 S & | 1050mm dia. DR19 HDPE pipe m 135 $ 45,225 6.0 02725S MANHOLES AND CATCHBASINS 6.1 1.6.2 1500mm Dia. Precast Manhole L.S. 100% $ 19,500 $ 233,350 10.0 PROVISIONAL SUM 10.1 1.10.1 100mm Asphalt Surface m2 250 S 12,500 TOTAL $ 245,850 OVERHEAD (based on estimate) Supervision ($3k/wk) $21,000 Office ($1.7k/wk) $11,900 Insurance per quote $2,200 Bonds not required so $35,100

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!