Question: Design a horizontal alignment for a freight railway to connect points A and B on the topo map shown in Fig . 3 . To
Design a horizontal alignment for a freight railway to connect points A and B on the topo
map shown in Fig To reduce operating costs, it is desired to keep the absolute value of the
grade at all points on the line to percent or less. The alignment of the railway
approaching A and B should match that of the existing tangents shown to the left of A and the
right of B The bearing of each of these tangents is NE You may select any design
standards you believe to be appropriate for this type of facility. Document your design by
means of a drawing showing stationing, bearings of tangents, deflection angles and radii of
horizontal curves, lengths of spiral transition curves, etc. Defend your design decisions in a
short report discussing design standards, design objectives, major design decisions, and your
rationale for your decisions.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
