Question: Design a schedule of work sampling observations in which eight observations are made during one eight-hour day. Using the following table, read the last digit

Design a schedule of work sampling observations
Design a schedule of work sampling observations in which eight observations are made during one eight-hour day. Using the following table, read the last digit going down column 1 for hours (e.g. 21520.), and read across row 10 from left to right in sets of two for minutes (e.g. 85 33 99 57 ) Arrange the times chronologically. Note: It is only possible to sample observations between 0000 and 07:59. Therefore, discard any sampled hour or minute values that do not conform to this time range. (Leave no cells blank - be certain to enter "0" wherever required.) 5 4627 2093 3856 1123 0120 2 3 4 5 6 7 0 9 10 11 12 6912 3491 4715 1632 5510 3950 7871 2716 2935 853) 0500 2951 2 7264 1192 2486 1546 7209 1328 7752 1396 8259 9952 1640 0131 2801 0575 2776 1950 0938 7343 0521 7354 9912 9585 2768 4359 8901 7547 2664 1844 2376 6083 8511 0249 3761 1039 4666 3095 2108 3956 7728 4028 2159 8387 4617 9964 1908 4237 2044 3957 8810 9207 2438 3352 3018 4421 Chronological order Observation Time 1 0 2 0 3 1 4 1 5 2 6 2 7 5 8 6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!