Question: Design and select ( from Manufacturer Catalogue i . e . , GE , Siemen etc ) a Gas turbine - Combined cycle power plant

Design and select (from Manufacturer Catalogue i.e., GE, Siemen etc) a Gas turbine- Combined cycle power plant that has a combined output of 800 ~ 1300 MW (select any of your output) and can achieve a cycle thermal efficiency of at least 60 percent, with a heating rate of not more than 5900 kJ/kWh. Prepare an engineering report (10 ~ 15 pages) describing your design. Your design report must include, but is not limited to, the following:
a) Discussion of various cycles/configuration attempted to meet the goal as well as the positive and negative aspects of your design.
b) System figures and T-s diagrams with labelled states and temperature, pressure, enthalpy, and entropy information for your design. Sample calculations.
c) Total Gas Consumption (MMBTU) for your design. The Cost of Gas in ($/MWh) both Tax Inclusive and exclusive, for the Indigenous gas at Rs.629 per MMBTU, Rs.1022 MMBTU, and RLNG Tariff (i.e @ Rs 1700 per MMBtu).
d) Total Levelized Cost ($/MWh) and in (PKR/kWh), if Non-Fuel O&M Cost is taken as $3.50, and Capital Returnis$21.24.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!