Question: Design control program for a vending machine using PLC , including wiring diagram,SFC , initial condition, transition, state, output, timer, counter if needed.Technical Requirements: 1

Design control program for a vending machine using PLC, including wiring diagram,SFC, initial condition, transition, state, output, timer, counter if needed.Technical Requirements:1. There are three kinds of beverage in the vending machine and only coins can be inserted into the machine, i.e.1$,5$,10$.2. When more than 1$ are inserted, the light of seven up is on. When more than5$ are inserted, the lights of seven up and cola are on. When more than 10$ are inserted, the lights of seven up, cola and mineral water (Evian) are on.3. When any button of beverage is pressed, it takes 7s to eject one tin of beverage.4. To give change, one button has to be pressed. When the change is more than1S, the light of seven up is still on. Similarly, when the change is more than5S, AKe lights of seven up and cola are on. When press the button for giving change, all the lights are off.Report should include this items1. Instruction of your design2. Wiring diagram with instructions3. SFC with instructions4. Programs, each part should be explained in words5. ConclusionsReport should be written within 5-10 pages.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!