Question: Design control program for a vending machine using PLC , including wiring diagram,SFC , initial condition, transition, state, output, timer, counter if needed.Technical Requirements: 1
Design control program for a vending machine using PLC including wiring diagram,SFC initial condition, transition, state, output, timer, counter if needed.Technical Requirements: There are three kinds of beverage in the vending machine and only coins can be inserted into the machine, ie$$$ When more than $ are inserted, the light of seven up is on When more than$ are inserted, the lights of seven up and cola are on When more than $ are inserted, the lights of seven up cola and mineral water Evian are on When any button of beverage is pressed, it takes s to eject one tin of beverage To give change, one button has to be pressed. When the change is more thanS the light of seven up is still on Similarly, when the change is more thanS AKe lights of seven up and cola are on When press the button for giving change, all the lights are off.Report should include this items Instruction of your design Wiring diagram with instructions SFC with instructions Programs, each part should be explained in words ConclusionsReport should be written within pages.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
