Question: Design the Wastewater Collection System for the given development. Provide a plan layout of the design showing the pipe sizes. Tower 3 Tower4 Tower5 Open

Design the Wastewater Collection System for the given development. Provide a plan layout of the design showing the pipe sizes.

Design the Wastewater Collection System for the given development. Provide a planlayout of the design showing the pipe sizes. Tower 3 Tower4 Tower5

Tower 3 Tower4 Tower5 Open Space South Road Tower 2 West Road Tower 9 Clubhouse/ Open Space/ Admin Office Tower 8 East Road Tower 6 North Road Tower 1 Commercial Tower Tower 7 The Towers Demand Requirement Area Tower 1 Tower 2 Tower 3 Tower 4 Tower 5 Tower 6 Tower 7 Tower 8 Tower 9 Commercial Tower Clubhouse / Open Spaces / Admin Office Detail 30-storey Residential 20-storey Residential 30-storey Residential 20-storey Residential 20-storey Residential 20-storey Residential 30-storey Residential 20-storey Residential 20-storey Residential 7-storey Commercial Mall Mixed-use Demand (ADD) 5 MLD 3.5 MLD 5 MLD 3.5 MLD 3.5 MLD 3.5 MLD 5 MLD 3.5 MLD 3.5 MLD 8 MLD 0.5 MLD Project Notes 1. Supply source will be from existing Water Service Provider tapping at West Road entry. Pressure available for site is 35 m-head. 2. Open space located at South Road cor. East Road will be utilized for STP and MRF. Tower 3 Tower4 Tower5 Open Space South Road Tower 2 West Road Tower 9 Clubhouse/ Open Space/ Admin Office Tower 8 East Road Tower 6 North Road Tower 1 Commercial Tower Tower 7 The Towers Demand Requirement Area Tower 1 Tower 2 Tower 3 Tower 4 Tower 5 Tower 6 Tower 7 Tower 8 Tower 9 Commercial Tower Clubhouse / Open Spaces / Admin Office Detail 30-storey Residential 20-storey Residential 30-storey Residential 20-storey Residential 20-storey Residential 20-storey Residential 30-storey Residential 20-storey Residential 20-storey Residential 7-storey Commercial Mall Mixed-use Demand (ADD) 5 MLD 3.5 MLD 5 MLD 3.5 MLD 3.5 MLD 3.5 MLD 5 MLD 3.5 MLD 3.5 MLD 8 MLD 0.5 MLD Project Notes 1. Supply source will be from existing Water Service Provider tapping at West Road entry. Pressure available for site is 35 m-head. 2. Open space located at South Road cor. East Road will be utilized for STP and MRF

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!