Question: Detention Pond Design For the given inflow hydrograph, design a detention basin that will reduce the peak flow out of the basin to 1 0

Detention Pond Design
For the given inflow hydrograph, design a detention basin that will reduce the peak flow out of the basin to 10 cfs.
\table[[\table[[Time],[(minutes)]],\table[[Inflow],[(cfs)]]],[0,0],[20,3.5],[40,5.5],[60,8.5],[80,11],[100,14.5],[120,17.5],[140,17],[160,15.5],[180,13.5],[200,11.5],[220,10],[240,8.5],[260,7.5],[280,6.5],[300,5.5],[320,4.5],[340,3.5],[360,2.5],[380,1.5],[400,0.5],[420,0]]
Your basin should be twice as long as it is wide. The side-slopes should be 3 horizontal to 1 vertical (3:1). I recommend that you have a round orifice on the bottom of your outlet structure (so that the basin will go completely dry after the storm. You are required to provide me with a design that shows the:
Length, width and water depth (during peak flow)
The configuration of your outlet structure (basic dimensions - don't worry about thickness of concrete and pipes, etc..)
A graph the shows both the inflow hydrograph and the outflow hydrograph
The spreadsheet that you developed to solve this problem. AND, NO, you cannot use any software other than a spreadsheet.
Hints: remember to watch the units (especially the units of time). Keep it simple, don't try to optimize the design. Develop and use your spreadsheet to route the storm through your basin.
Detention Pond Design For the given inflow

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!