Question: Determine: 1 . Dredge set characteristics a . #arcs / set b . #buckets / arc c . Short - term production rate 2 .

Determine:
1. Dredge set characteristics
a. #arcs/set
b. #buckets/arc
c. Short-term production rate
2. Project characteristics (assuming no mechanical or other delays)
a. Number of buckets and arcs required to complete 1 lane
b. Total number of buckets and arcs to complete entire project
c. Time required to fill 1 scow
d. Total number of scows required to avoid delaying the dredging operation
e. Total volume of sediment and water removed.
f. Long-term production rate
g. Time required to complete the project