Question: Determine a linear trend line for expected freight car loadings Y = __ + __ t Use the above trend equation to predict expected loadings

Determine a linear trend line for expected freight car loadings
Y = __ + __ t
Use the above trend equation to predict expected loadings for Weeks 20 & 21
The manager intends to install new equipment when the volume exceeds 920 loadings per week. Assuming the current trend continues, in which week (at the earliest) should the loading volume reach that level? Use the rounded answers from any previous part of this problem. Do not round any other intermediate calculations
Week123456Number340345350345350355Week789101112Number405445485480520560Week131415161718Number565570620625630635