Question: Determine the productivity rate for the work provided below based on cycle time analysis. (Round to the nearest thousandth) - Type of work-hauling materials from

Determine the productivity rate for the work
Determine the productivity rate for the work provided below based on cycle time analysis. (Round to the nearest thousandth) - Type of work-hauling materials from the borrow pit - Average cycle time-33 minutes - Truck capacity-17 tons - Crew-1 operator - Productivity factor- 0.85 - System efficiency-31 minutes per hour