Question: determine the steps yourself and answer question 1 and 2 thank you Summary Current Proposed Savings Place: Mechanical Factory Activity: m45 Turning Date: 06/07/2006 Operator:

determine the steps yourself and answer question 1 and 2 thank you
Summary Current Proposed Savings Place: Mechanical Factory Activity: m45 Turning Date: 06/07/2006 Operator: Analyzer Type of flowchart Method Current Proposed Type. Worker Material Thoughts: Event Operation Carrying Delay Control Storage 57.45 113 Time(min) Distance(m) Cost Time(min) Event Discription Symbol b symbB v Distance(m) Method Proposed 2.0 18 Carrying the raw material 1.0 Reading work order and drawing Receiving and connecting the part Cleaning forehead 2.5 7.5 0.5 Measurement Control Tailstock drilling 4.5 Docking the tailstock 0.45 Turning 12.5 0.5 Measurement Control 1.5 Chamfering at the end of the part 2.0 Disassemble and rack the part 5.0 75 Taking parts to quality control Quality control 10 3.0 Delivery of parts to warehouse 20 Storage 4.5 Name Surname: Question #1: Fill in the above Work Flow Chart according to the information provided. Question #2: Draw a process chart for book printing and binding. (Determine the steps yourself, use the back page.)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
