Question: Determine the values in the following table Activity Predecessor Work days Total woking hours Labour Rate $/hours Labour cost : Material Cost Equipment Cc Travel

Determine the values in the following table

Determine the values in the following table Activity Predecessor Work days Total

Activity Predecessor Work days Total woking hours Labour Rate $/hours Labour cost : Material Cost Equipment Cc Travel cos Total cost 1 Gather Data by distributing questionnaire 80 120 9600 960 2 Gather Data by sharing out survey 80 120 9600 960 3 Face to face meeting with customer 1,2 120 4800 480 4 Call in interview with customer 1,2 120 2880 0 2881 5 Recognize the weak points of the existing system 3.4 120 9200 19200 6 Pinout the improvement areas of the existing system 160 120 19200 19200 7 Identify the must carryover from the existing system 80 120 9600 960 8 Define user requirement 3.4 240 120 28800 2880 9 Define Automotive design standard 3.4 40 120 4800 4801 0 Define all system component 78.9 160 120 19200 1920 11 Specify subsystems logic 200 120 24000 2400 12 Sketch block diagram 120 120 14400 14400 3 list down characteristic of all component [ voltage, current,interfaces.. 10 120 7680 0 7680 14 list input signals available for the system 2.13 120 4800 0 480 5 list output signals required to control OR power ON/OFF 120 4800 4800 16 Define number of controllers to be used 80 120 9600 9600 17 Specify space available for controllers 120 480 480 18 Choose controller type in each location 120 18000 120000 170000 960 19 Communicate mechanical interface 18 120 960 20 Sketch draft component allocation for dashboard 160 120 1920 1000 19200 21 Specify space available for switches, gauges, controls,.. 120 4800 4800 22 Identify max speed can be achieved and Select speedometer 4 120 4800 480 23 Identify mak torque available and Select tachometer 120 480 0 4800 24 Recognize fuel tank size and Select fuel level sensor and gauge 120 9600 0 9600 25 Define engine coolant temperature requirement and select its gauge 120 4800 0 480 26 Pinout engine and transmission warnings requirements 120 1920 192 27 list down user warning requirements/ vehicle informative signs requirec 120 4900 0 4800 28 Choose tell-tale display for signs 120 1920 1000 200 2340 29 Determine control interfaces required 384 384 30 Define proper type for each control (light, wiper and cruise, window , mi 120 9200 19200 31 Select display 120 960 000 0 200 1980 32 Determine switches function required 120 3840 3840 33 Define proper switch type for each function ( hazard, brake light switch 120 4800 0 4800 34 Select 12V/ sockets, USB entry port and volume adjust 120 1152 0 1152 35 Check Transmission options for gear selector and select one 120 1920 0 1920 36 Check Engine and Transmission options for Throttle pedal and select 120 1920 1920 37 Check power availability to power up lights 35,33,19 7680 0 0 7680 38 Determine space allocated for lights 2880 2880 39 Select front position light, high beam light, front indicator and marker lig 120 5360 0 0 15360 40 Select rear position light, reverse light, brake light and rear indicator 120 1536 0 0 15360 41 Select side indicators 20 3840 3840 42 Select driver, co driver light and passenger lights 120 11520 11520 43 Calculate power budget 120 1920 1920 44 Decide on alternator 120 1920 192 45 Select batteries 120 3840 3840 46 Draw system circuit diagram 120 5760 0 67600 47 Design wire sizes and check max current to pass through each 120 1440 0 1440 48 Protect wires with fuses 20 9600 960 49 Check control circuits 41 120 480 0 4800 50 Add relays to simplify the control 120 576 576 51 Categorize the harnesses 13.46 120 4800 480 52 Establish harness routing and define layout 52 30 120 2880 2880 53 Sketch detailed harnesses drawings 53 90 120 86400 8640 54 Define high power requirement 120 480 4800 55 Establish cable routing 55 120 11520 0 1152 56 Sketch detailed drawing for positive cables and negative straps 30 240 120 2880 0 28800 57 Evaluate the design 48,50,53,57 30 240 120 28800 0 28800 58 Book for POR meetings with all stakeholders 58 120 960 960 59 Held the meetings and list down recommendation 10 80 120 9600 0 0 9600 60 Write the POR reports 3 24 120 2880 2880 61 Develop software 61 20 160 20 19200 19200 62 Manufacture one set 70 560 70 39200 1200000 0 5000 124420 63 Purchase other item: 61 16 100 1600 970000 2000 973601 64 Purchase test bench material (table... ) 61 160 100 16000 2090 65 Build test bench 62.63,64.65 240 70 1680 2000 2000 19800 66 Conduct bench testing and write the report 20 160 120 19200 I 19200 67 Barrow vehicle 61 00000 106800 NGE 40 120 4800 68 Strip the test bench 68 16 100 160 2000 1600 69 Connect the new architecture using test bench material 69 30 240 100 2400 2000 2400 70 Conduct vehicle testing and write the report 70 18 14 4 120 1728 0 1728 71 Book for COR meetings with all stakeholders 71 16 120 1920 0 1920 72 Held the COR meetings and write the reports 40 120 480 4801 73 Release designs for production 240 120 28800 28800 74 Deliver to customer and acceptance 40 20 4800 2000 6800 75 Train drivers 74,75 80 100 8000 0 0 800 76 Issue operation/service manual 76 240 100 24000 2400 1071 8568 8900 73120 2426000 5400 341452

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!