Question: Determining an exact date of system completion is an example of ___. A. Cause-and-effect B. Objective C. Constraint D. None of the above Information Engineering
Determining an exact date of system completion is an example of ___.
| A. | Cause-and-effect
| |
| B. | Objective
| |
| C. | Constraint
| |
| D. | None of the above
|
Information Engineering focusses specifically on the ___.
| A. | Processes
| |
| B. | Structure of stored data
| |
| C. | A and B
|
___ investigates the solution fulfillment of the users requirements.
| A. | Economic feasibility
| |
| B. | Operational feasibility
| |
| C. | Technical feasibility
| |
| D. | None of the above |
Decision Analysis Phase determines ___.
| A. | The best solution
| |
| B. | The worthiness of looking at a project
| |
| C. | What the new system must do
| |
| D. | Users need from the new system |
Structured analysis focusses specifically on ___.
| A. | Entities
| |
| B. | Processes
| |
| C. | Flow of data between processes
| |
| D. | All of the above |
1
-
1). Aggregation relationships do not support inheritance.
1
2
-
2). Business process redesign (BPR) is triggered by TQM and Continuous Process Improvement.
1
3
-
3). A Candidate Systems Matrix is a tool used to rank candidate systems.
1
4
-
4). A Project charter is the final deliverable for the preliminary phase.
1
5
-
5). Collecting Functional requirements is mandatory while for non-functional requirements collection is optional.
1
6
-
6). Cause-and-effect analysis is performed in the Scope definition phase.
1
7
-
7). A Composite data flow consists of other data flows.
1
8
-
8). Actions on parallel flows beneath the fork can occur in any order or concurrently.
1
9
-
9). A state chart diagram is a diagram used to graphically depict the flow of a business process.
1
10
-
10). A Physical model is a non-technical pictorial representation that depicts how the system is implemented.
1
11
-
Determining an exact date of system completion is an example of ___.
A. Cause-and-effect
B. Objective
C. Constraint
D. None of the above
1
12
-
Information Engineering focusses specifically on the ___.
A. Processes
B. Structure of stored data
C. A and B
D. None of the above
1
13
-
___ investigates the solution fulfillment of the users requirements.
A. Economic feasibility
B. Operational feasibility
C. Technical feasibility
D. None of the above
1
14
-
Decision Analysis Phase determines ___.
A. The best solution
B. The worthiness of looking at a project
C. What the new system must do
D. Users need from the new system
1
15
-
Structured analysis focusses specifically on ___.
A. Entities
B. Processes
C. Flow of data between processes
D. All of the above
1
16
-
System ___ are highly engaged in driving system analysis.
A. Owners
B. Users
C. A and B
D. None of the above
The Problem Analysis Phase determines ___.
| A. | The worthiness of looking at a project
| |
| B. | The worthiness of building a system
| |
| C. | What the new system must do
| |
| D. | None of the above |
___ is an accelerated systems analysis technique that identifies the users business requirements and implements a quick system's version.
| A. | Discovery prototyping
| |
| B. | Rapid Application Methodology
| |
| C. | Dirty Prototyping
| |
| D. | All of the above |
___ is a graphical depiction of a systems static object structure
| A. | Class diagram
| |
| B. | Sequence diagram
| |
| C. | Activity diagram
| |
| D. | None of the above |
The Logical Design Phase determines ___.
| A. | What the new system must do
| |
| B. | Users need from the new system
| |
| C. | The best solution
| |
| D. | None of the above |