Question: Develop a flow net for the case show below. Assume three or four flow channels. Cutoff wall is impervious. Draw the cross - section to
Develop a flow net for the case show below. Assume three or four flow channels. Cutoff wall is impervious.
Draw the crosssection to scale on engineering paper or AutoCAD hint: do not use an exaggerated scale rather, use : mathrmH: mathrmV scales. The use of software to construct equipotential and flowlines is not allowed The drawing should take up most of the page landscape orientation required and must use at least three flow channels; you may find the use of more channels easier. Since all of the following calculations will be based on this drawing, take your time. Double check that your drawing follows the rules of flow net construction, and look at examples in the text for guidance operatornamePgs Hint: you may use partial equipotential drops, egDelta h ; however, you must indicate where these are and what fraction of a drop you are using. The flownet you draw is worth of this homework.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
