Question: Develop the activity sequence model and determine the normal time for the following work activities: 1. A worker sitting on chair stands up walk 7
Develop the activity sequence model and determine the normal time for the following work activities: 1. A worker sitting on chair stands up walk 7 steps toward an old cabinet. He opens the old drawer and he face some resistance because the drawer is kind stuck. 2. He collects 8 screws from the drawer and returns back to his chair which 7 steps away, sit down and hold the screws. 3. He inserts with adjustments the 8 screws in each hole in laptop in front of him. 4. He picks up the screwdriver laying aside next to him and turns each screw X times using wrist action. After he is done, he performs Y(unknown) body motion put the screwdriver next to the laptop.
| No. | Method Description | Action | Sequence Model | TMU |
| 1 |
| General Move | A B G A B P A |
|
| Control Move | A B G M X I A | |||
| Tool Use | A B G A B P _
A B P A | |||
| 2 |
| General Move | A B G A B P A |
|
| Control Move | A B G M X I A | |||
| Tool Use | A B G A B P _ A B P A | |||
| 3 |
| General Move | A B G A B P A |
|
| Control Move | A B G M X I A | |||
| Tool Use | A B G A B P _
A B P A | |||
| 4 |
| General Move | A B G A B P A |
|
| Control Move | A B G M X I A | |||
| Tool Use | A B G A B P _
A B P A | |||
|
| Total TMU = | |||
GIVE THE SOLUTION IN THE ABOVE TABLE PLEASE
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
