Question: Develop the activity sequence model and determine the normal time for the following work activities: Using M.O.S.T A worker sitting on chair stands up walk
Develop the activity sequence model and determine the normal time for the following work activities: Using M.O.S.T
- A worker sitting on chair stands up walk 10 steps toward an old cabinet. He open the old drawer and he face some resistance because the drawer is kind stuck.
- He collects 5 screws from the drawer and returns back to his chair and set down.
- He inserts with adjustments the 5 screws in each hole in laptop in front of him.
- He picks up the screwdriver laying aside next to him and turns each screw X times. After he is done, he performs Y(unknown) body motion put the screwdriver next to the laptop.
- If the total TMU is 1640 which one of the following is true. Hint chose the answer that is close to your value if not exact (Show your work)
- X= 9 turns and Y is no body motion
- X= 3 turns and Y is sitting down
- X= 3 turns and Y is standing up
- X=5 turns and Y is standing up
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
